Transaction
Floor: 5
Flat:
B
SA: 950 ft2 (@ 8,821)
GFA: 1,066 ft2 (@ 7,861)
2025-03-19
$8.38 M
Floor: L1
Park NO.:
89
SA: 950 ft2 (@ 8,821)
GFA: 1,066 ft2 (@ 7,861)
2025-03-19
$8.38 M
Floor: L2
Park NO.:
15
SA: 957 ft2 (@ 9,247)
GFA: 1,075 ft2 (@ 8,232)
2025-01-22
$8.85 M
Floor: 3
Flat:
A
SA: 957 ft2 (@ 9,247)
GFA: 1,075 ft2 (@ 8,232)
2025-01-22
$8.85 M
Floor: L1
Park NO.:
129
SA: 959 ft2 (@ 9,822)
GFA: 1,077 ft2 (@ 8,746)
2024-11-21
$9.42 M
Floor: 5
Flat:
A
SA: 959 ft2 (@ 9,822)
GFA: 1,077 ft2 (@ 8,746)
2024-11-21
$9.42 M
Floor: L1
Park NO.:
63
SA: 1,109 ft2 (@ 9,404)
GFA: 1,248 ft2 (@ 8,357)
2024-10-28
$10.43 M
Floor: 2
Flat:
C
SA: 1,109 ft2 (@ 9,404)
GFA: 1,248 ft2 (@ 8,357)
2024-10-28
$10.43 M
Floor: L1
Park NO.:
154
SA: 1,106 ft2 (@ 9,222)
GFA: 1,243 ft2 (@ 8,205)
2024-09-10
$10.2 M
Floor: 3
Flat:
D
SA: 1,106 ft2 (@ 9,222)
GFA: 1,243 ft2 (@ 8,205)
2024-09-10
$10.2 M
Floor: L1
Park NO.:
27
SA: 968 ft2 (@ 6,198)
GFA: 1,087 ft2 (@ 5,519)
2024-08-15
$6 M
Floor: 6
Flat:
A
SA: 968 ft2 (@ 6,198)
GFA: 1,087 ft2 (@ 5,519)
2024-08-15
$6 M
Floor: L1
Park NO.:
109
SA: 1,109 ft2 (@ 10,640)
GFA: 1,248 ft2 (@ 9,455)
2024-07-02
$11.8 M
Floor: 3
Flat:
C
SA: 1,109 ft2 (@ 10,640)
GFA: 1,248 ft2 (@ 9,455)
2024-07-02
$11.8 M
Floor: L1
Park NO.:
59
SA: 950 ft2 (@ 9,031)
GFA: 1,066 ft2 (@ 8,048)
2024-04-23
$8.58 M
Floor: 1
Flat:
B
SA: 950 ft2 (@ 9,031)
GFA: 1,066 ft2 (@ 8,048)
2024-04-23
$8.58 M
Floor: L1
Park NO.:
45
SA: 1,109 ft2 (@ 8,115)
GFA: 1,248 ft2 (@ 7,211)
2024-04-02
$9 M
Floor: 3
Flat:
D
SA: 1,109 ft2 (@ 8,115)
GFA: 1,248 ft2 (@ 7,211)
2024-04-02
$9 M
Floor: 1
Flat:
C
SA: 1,109 ft2 (@ 9,900)
GFA: 1,248 ft2 (@ 8,798)
2024-01-17
$10.98 M
Floor: L1
Park NO.:
154
SA: 1,109 ft2 (@ 9,900)
GFA: 1,248 ft2 (@ 8,798)
2024-01-17
$10.98 M
Floor: L1
Park NO.:
154
SA: 1,109 ft2 (@ 9,900)
GFA: 1,248 ft2 (@ 8,798)
2023-12-11
$10.98 M
Floor: 1
Flat:
C
SA: 1,109 ft2 (@ 9,900)
GFA: 1,248 ft2 (@ 8,798)
2023-12-11
$10.98 M
Floor: L1
Park NO.:
157
SA: 1,109 ft2 (@ 10,820)
GFA: 1,248 ft2 (@ 9,615)
2023-10-31
$12 M
Floor: 3
Flat:
C
SA: 1,109 ft2 (@ 10,820)
GFA: 1,248 ft2 (@ 9,615)
2023-10-31
$12 M
Floor: L1
Park NO.:
78
SA: 959 ft2 (@ 10,093)
GFA: 1,077 ft2 (@ 8,987)
2023-10-26
$9.68 M
Floor: 5
Flat:
B
SA: 959 ft2 (@ 10,093)
GFA: 1,077 ft2 (@ 8,987)
2023-10-26
$9.68 M
Floor: 1
Flat:
D
SA: 1,109 ft2 (@ 9,017)
GFA: 1,248 ft2 (@ 8,012)
2023-09-18
$10 M
Floor: L1
Park NO.:
49
SA: 1,106 ft2 (@ 9,945)
GFA: 1,244 ft2 (@ 8,842)
2023-05-29
$11 M
Floor: 2
Flat:
D
SA: 1,106 ft2 (@ 9,945)
GFA: 1,244 ft2 (@ 8,842)
2023-05-29
$11 M
Floor: L1
Park NO.:
159
SA: 1,317 ft2 (@ 12,513)
GFA: 1,474 ft2 (@ 11,180)
2023-04-17
$16.48 M
Floor: 6-07
Flat:
D
SA: 1,317 ft2 (@ 12,513)
GFA: 1,474 ft2 (@ 11,180)
2023-04-17
$16.48 M
Floor: L1
Park NO.:
25
SA: 923 ft2 (@ 13,867)
GFA: 1,038 ft2 (@ 12,331)
2023-04-06
$12.8 M
Floor: G
Flat:
B
SA: 923 ft2 (@ 13,867)
GFA: 1,038 ft2 (@ 12,331)
2023-04-06
$12.8 M
Floor: L2
Park NO.:
47
SA: 959 ft2 (@ 11,157)
GFA: 1,077 ft2 (@ 9,935)
2023-03-20
$10.7 M
Floor: 1
Flat:
A
SA: 959 ft2 (@ 11,157)
GFA: 1,077 ft2 (@ 9,935)
2023-03-20
$10.7 M
Floor: L2
Park NO.:
47
SA: 959 ft2 (@ 11,157)
GFA: 1,077 ft2 (@ 9,935)
2023-03-10
$10.7 M
Floor: 1
Flat:
A
SA: 959 ft2 (@ 11,157)
GFA: 1,077 ft2 (@ 9,935)
2023-03-10
$10.7 M
Floor: L1
Park NO.:
71
SA: 1,106 ft2 (@ 14,285)
GFA: 1,248 ft2 (@ 12,660)
2023-01-06
$15.8 M
Floor: 4
Flat:
C
SA: 1,106 ft2 (@ 14,285)
GFA: 1,248 ft2 (@ 12,660)
2023-01-06
$15.8 M
Floor: L1
Park NO.:
53
SA: 1,109 ft2 (@ 11,541)
GFA: 1,248 ft2 (@ 10,256)
2023-01-06
$12.8 M
Floor: 1
Flat:
D
SA: 1,109 ft2 (@ 11,541)
GFA: 1,248 ft2 (@ 10,256)
2023-01-06
$12.8 M
Floor: L1
Park NO.:
127
SA: 957 ft2 (@ 13,061)
GFA: 1,075 ft2 (@ 11,627)
2023-01-06
$12.5 M
Floor: 6
Flat:
A
SA: 957 ft2 (@ 13,061)
GFA: 1,075 ft2 (@ 11,627)
2023-01-06
$12.5 M
Floor: L1
Park NO.:
159
SA: 1,317 ft2 (@ 12,513)
GFA: 1,474 ft2 (@ 11,180)
2023-01-05
$16.48 M
Floor: 6-07
Flat:
D
SA: 1,317 ft2 (@ 12,513)
GFA: 1,474 ft2 (@ 11,180)
2023-01-05
$16.48 M